Telecommunication Regulation
| Frequency Spectrum Pricing Policy |
Oman |
| Client: |
Telecommunications Regulatory Authority |
| Date: |
2007 – 2008 |
The TRA intended to update its frequency spectrum pricing policy to adapt to new technologies and the changed market situation so as to encourage and facilitate privatisation.
Austroconsult reviewed the current policy, elaborated coverage models and a study report on peer countries and developed the new spectrum pricing policy.
|
 |
| Frequency Spectrum Pricing Policy |
United Arab Emirates |
| Client: |
Telecommunications Regulatory Authority |
| Date: |
2005 – 2008 |
The TRA intended to develop a new scheme for spectrum pricing policies, rules, procedures and regulations. Furthermore, criteria for the verification of coverage were to be analysed.
Austroconsult reviewed the current policy, elaborated coverage models and a study report on peer countries and developed the new spectrum pricing policy.
|
 |
| Telecommunications Network Optimisation |
United Arab Emirates |
| Client: |
Abu Dhabi Distribution Company |
| Date: |
2007 – 2009 |
In view of telecom liberalisation a custom-tailored concept offering perfect solutions for the last mile problem and future application of fibre-to-the-home and fibre-to-the-curb was to be developed.
Austroconsult was contracted for surveys, studies, and development of vision and strategy as well as of operational concepts.
|
 |
| Digital Trunked Radio System |
United Arab Emirates |
| Client: |
Abu Dhabi Police |
| Date: |
1996 – 2009 |
The Police intended to modernise its entire telecommunications and IT system (TETRA). Most modern command software was to support day-by-day and emergency activities.
Austroconsult was engaged in surveys, propagation planning, field strength measurements, elaboration of design, project supervision and commissioning.
|
 |
| Telecommunications Network Optimisation |
United Arab Emirates |
| Client: |
TRANSCO |
| Date: |
2005 – 2007 |
Telecom liberalisation and the need for network improvement initiated modernisation / expansion of the telecom network concerning various installations, e.g., sub-stations and the SCADA network.
Austroconsult was contracted for surveys, studies, strategy, operational concepts, database management, tender documents and evaluation of offers.
|
 |
| TV Coverage |
United Arab Emirates |
| Client: |
EMI, Public Works Department |
| Date: |
1993 – 2005 |
EMI set up a second chain of transmitters and modernised the existing ones at Liwa, Jebel Dhanna, Jebel Hafit, Bu Hasa and Al Maqam.
Austroconsult was entrusted with the survey work, field measure- ments, propagation planning, elaboration of system design, specifications and tender documents, evaluation of offers and supervision.
|
 |
| MW Broadcasting Station New Dammam |
Saudi Arabia |
| Client: |
Ministry of Information |
| Date: |
2000 – 2006 |
Operational problems caused by the site’s regular flooding as well as by shortfalls in coverage led to the intention to upgrade and modernise the medium wave and FM broadcasting station in Dammam.
Austroconsult was entrusted with the feasibility study, design, elaboration of tender documents and project supervision.
|
 |
| Optical Fibre Sea Cable Telecom Project |
Cape Verde Islands |
| Client: |
Cabo Verde Telecom |
| Date: |
1995 – 2001 |
The Cape Verde Islands were interconnected by troposcatter and microwave communication links of limited capacity. Also, the telephone networks on Santiago Island served only a few thousand subscribers.
Austroconsult provided studies, propagation planning, field strength measurements concerning the back-up microwave systems, design as well as supervision.
|
 |
|